Skip to main content

Project ManagementLaajuus (5 cr)

Code: R504D56

Credits

5 op

Teaching language

  • English

Objective

The student understands the principles of project management and can produce the documentation required by the project. The student is capable to apply project management practices in a small-scale IT project.

Content

Basics of project management: process and documentation

- Integration Management
- Scope Management
- Schedule Management
- Cost Management
- Quality Management
- Resource Management
- Communication Management
- Risk Management

Assessment criteria, satisfactory (1)

The student outlines the phases of project process.

The student can produce the documentation required by the project. The student can carry out the project, but the control of the implementation is random and incomplete and is not based on indicators.

Assessment criteria, good (3)

The student knows the phases of project process.

The student can produce the documentation required by the project.

The student can take the project through and guide the project based on indicators.

Assessment criteria, excellent (5)

The student has an in-depth knowledge of the phases of project process.

The student can produce high-quality project documentation.

The student can guide the project based on the information produced by the project indicators.

Enrollment

01.10.2021 - 25.12.2021

Timing

17.01.2022 - 15.04.2022

Credits

5 op

Virtual proportion (cr)

1 op

RD proportion (cr)

1 op

Mode of delivery

80 % Contact teaching, 20 % Distance learning

Unit

Bachelor of Engineering, Information Technology

Teaching languages
  • English
Degree programmes
  • Degree Programme in Information and Communication Technology
Teachers
  • Juhani Angelva
Responsible person

Juhani Angelva

Student groups
  • R54D21S
    Bachelor of Engineering, Machine Learning and Data Engineering (full time studies), 2021

Objective

The student understands the principles of project management and can produce the documentation required by the project. The student is capable to apply project management practices in a small-scale IT project.

Content

Basics of project management: process and documentation

- Integration Management
- Scope Management
- Schedule Management
- Cost Management
- Quality Management
- Resource Management
- Communication Management
- Risk Management

Materials

Kathryn N. Wells , Timothy J. Kloppenborg, Project Management Essentials, Second Edition

Teaching methods

Lectures and a learning project.

Exam schedules

No exam.

Evaluation scale

H-5

Assessment criteria, satisfactory (1)

The student outlines the phases of project process.

The student can produce the documentation required by the project. The student can carry out the project, but the control of the implementation is random and incomplete and is not based on indicators.

Assessment criteria, good (3)

The student knows the phases of project process.

The student can produce the documentation required by the project.

The student can take the project through and guide the project based on indicators.

Assessment criteria, excellent (5)

The student has an in-depth knowledge of the phases of project process.

The student can produce high-quality project documentation.

The student can guide the project based on the information produced by the project indicators.

Assessment methods and criteria

Assessment criteria - grade 1 - 2
The student outlines the phases of project process.

The student can produce the documentation required by the project. The student can carry out the project, but the control of the implementation is random and incomplete and is not based on indicators.

Assessment criteria - grade 3 - 4
The student knows the phases of project process.

The student can produce the documentation required by the project.

The student can take the project through and guide the project based on indicators.

Assessment criteria - grade 5
The student has an in-depth knowledge of the phases of project process.

The student can produce high-quality project documentation.

The student can guide the project based on the information produced by the project indicators.